Product Overview:
Connect the water supply end of the freeze protector to the branch pipe entering the house, as indicated by the freeze protector's markings. For single-story homes, the water meter should be connected to the indoor riser pipe, and it’s best to install the meter in a vertical position.
Category:
Keywords:
Smart Anti-Freeze Series for Buildings
0
- Product Description
-
- Name: Sanhuali Smart Anti-Freeze Device for Water Pipelines
- 商品编号: 9989397287847444481
Connect the water supply end of the freeze protector to the branch pipe entering the house, as indicated by the freeze protector's markings. For single-story homes, the water meter should be connected to the indoor riser pipe, and it’s best to install the meter in a vertical position.
Connect the water supply end of the freeze protector to the inlet branch pipe according to the protector's markings, and then attach the inlet pipe of the freeze protector to the building entry point. For single-story homes, install the water meter on the indoor riser pipe, ideally positioning it vertically. When installing the freeze protector in a multi-story building’s pipe shaft, connect the user’s water meter after the freeze protector, ensuring that the inlet-side connection of the meter is directed toward the various water usage points inside the home.
An automatic breather valve must be installed at the highest point of the horizontal piping inside the user’s premises. If an automatic breather valve is not installed and antifreeze protection is required, first press the antifreeze button, then make sure to open all faucets connected to water outlets completely. Before using water, close all faucets again before pressing the water-use button to resume normal water flow. If an automatic breather valve is already installed, there’s no need to manually turn individual faucets on or off.
Install the controller on a suitable indoor wall surface, and connect each wire end to the corresponding terminals on the controller according to the instructions. When installing in building pipe shafts, attach pipes from the frost-proof device drain outlets of each unit, routing them into a single drainage pipe that leads either to a nearby sewer line or an underground ditch.- 三华利供水管道智能防冻器
Intent Consultation
Related News
2024-03-20
Recently, the Shandong Provincial Association for Science and Technology announced the results of the 7th Shandong Science and Technology Workers' Innovation Competition. Organized by the Shandong Provincial Association for Science and Technology and hosted by the Shandong Provincial Institute of Electronics, the Jinan City Association for Science and Technology, and the Inspur Innovation Center, the event saw participation from candidates recommended by the Weifang City Association for Science and Technology. After rigorous evaluation stages—including an initial review by a panel of experts, a re-review, a live final round, and public announcement—the project "Research and Application of Anti-Freezing Technology for Drainage Pipes Along Railway Sidewalls in Cold Regions," independently developed by Shandong Sanhuali Machinery Technology Co., Ltd., was awarded second prize in the competition.
2026-06-25
On June 25, 2026, the technical service team of Shandong Sanhuali Machinery Technology Co., Ltd. visited the Qilu Petrochemical Refinery to conduct a specialized after-sales inspection and technical coordination for freeze‑proof, self‑cleaning composite eyewash stations. During the on-site visit, through hands-on testing of installed equipment and discussions on operational suitability, the plant’s maintenance personnel expressed high praise for Sanhuali’s products, noting their comprehensive functionality, stable long-term performance, and full compliance with emergency protection standards for high‑risk chemical environments. During the on-site service phase, our technicians provided meticulous, end-to-end practical training, thoroughly explaining the standard operating procedures for the equipment. They also developed a standardized maintenance and operation guideline, focusing on key areas such as routine inspection protocols, circulating water quality management, emergency response to chemical splashes, and long-term equipment upkeep. Upholding our company’s core service principles of “sincerity, professionalism, efficiency, and thoroughness,” we delivered tailored, one‑on‑one technical support that alleviated the customer’s operational concerns, earning unanimous acclaim from the Qilu Petrochemical plant team.